Tuesday, May 4, 2010
Week 36: Still Settling In
It has been a while since an update, and we just wanted to say that we will be posting more infrequently now as our re-start is nearing completion. We are focusing on ironing out the wrinkles as production returns to normal and then we will be setting our sites on designing and introducing new products to add to the collection.
Labels:
general
Monday, March 8, 2010
Week 28: Back in production!!
Finally, after 28 long (and somehow very fast) weeks, we are starting to build furniture in our new workshop!! The road to get here has definitely been up and down, but we are so excited and very much relieved to be finally producing furniture again.
Here are a number of prepared finger-jointed panels that are awaiting glue-up to become a batch of our very popular Touch benches.
And here are Thomas and John putting parts for our Petits Fours Bed through the sander.
Here is our first large load of wood, delivered and ready to go.
John doing some panel dimensioning on the new table saw.
Some walnut panels that are in the process of being finger-jointed.
Some walnut panels that are in the process of being finger-jointed.
Here are a number of prepared finger-jointed panels that are awaiting glue-up to become a batch of our very popular Touch benches.
And here are Thomas and John putting parts for our Petits Fours Bed through the sander.
Sunday, February 28, 2010
Week 27: All the final details…
The organization of the shop is continuing. Even though it would be nice to just get production started, it is important to get everything in place so that when we start making furniture again it can happen efficiently and effectively. Here are some images of the fine details that have been keeping us occupied.
Creating shelving and cupboards for all our supplies and small power tools. This wall of storage is awaiting doors to close it all in and keep it dust free.
Finalizing airlines (blue), dust collection piping (silver) and creating hanging racks for long sand paper belts.
Creating shelving and cupboards for all our supplies and small power tools. This wall of storage is awaiting doors to close it all in and keep it dust free.
Organizing our assembly area so all our hardware (door hinges, drawer runners, etc) are easily accessible.
Finalizing airlines (blue), dust collection piping (silver) and creating hanging racks for long sand paper belts.
John making shop carts.
Salvaged clamps that have been scrubbed off and are all set, ready to go.
Labels:
general
Monday, February 22, 2010
Week 26: Taking the plunge with new machinery
Well, this week saw us take a very exciting step to push our business to the next level. After much planning and deliberation (that began long before the tornado took place) we have invested in a 5-axis CNC (computer numerically controlled) router! Our machine of choice is the Homag BMG 500, an amazing German-built machine that is considered one of the best in the industry.
While the business person in me is continually scrutinizing the cost vs return on investment, the designer in me is giddy with excitement about the possibilities this machine has to offer. Not only will it improve the accuracy and speed of our production, it will allow us to open up our design scope to incorporate curves and angles in a way that we never could produce efficiently before.
While the business person in me is continually scrutinizing the cost vs return on investment, the designer in me is giddy with excitement about the possibilities this machine has to offer. Not only will it improve the accuracy and speed of our production, it will allow us to open up our design scope to incorporate curves and angles in a way that we never could produce efficiently before.
The order is in and the machine is expected in the summer. We cannot wait to get it into the workshop and put it to work for us!
Friday, February 5, 2010
Week 25: Adding return air to the dust collector
Just when you thought we could not add any more piping to the workshop, we have gone ahead and installed a return air system on our new dust collector. This allows the air that gets sucked out of the shop with the dust system to be returned back into the workshop dust free, saving on heating costs and improving general ventilation. It is a small opening (as you can see below in the foreground), but makes a huge difference.
One of the hazards of fine wood dust is that it is extremely explosive in the right (or perhaps I should say wrong!) circumstances. All dust collection units are equipped with blast gates that allow the force of an explosion to release outside of the building and not blow back into the workshop through the collection piping.
In light of this, a dust collector with a return air system requires an essential feature called a spark detection system. It operates to detect any possible flammable material (a minor spark) and sprays it with water before it reaches the main dust container, avoiding an explosion. You can see the attachments for the spark detection (waiting to get wired in by the electrician) on the main out-feed pipe below.
The other element necessary is an abort gate on the return air unit, which will automatically shut if a spark is detected. In the case that an explosion does occur, this would prevent any of the fire being forced back into the shop through the return air piping.
The other element necessary is an abort gate on the return air unit, which will automatically shut if a spark is detected. In the case that an explosion does occur, this would prevent any of the fire being forced back into the shop through the return air piping.
Sunday, January 31, 2010
Week 23: The building is complete!
Although the work continues apace on the inside, we are so excited to see that the outside of the building is finished! Here are some views of how it looked on a recent bright winter morning.
Saturday, January 23, 2010
Week 22: Freshening up
While we continue to focus most of our energy on the set-up of the workshop, we also started the face-lift of the office, including some nice bright paint there and in the foyer to help keep us awake on dark winter days.
We also took delivery of our new front door, and the exterior light fixtures were put into position. Looking good!